Yes — open to PMA up to 100%.
Operating license routes through Ministry of Energy & Mineral Resources, not OSS — Emerhub handles the application end-to-end.
- Foreign ownership
- 100% PMA
- Sector regulator
- Ministry of Energy & Mineral Resources (ESDM)
- Min. paid-up capital
- IDR 2.5B paid-up · BKPM Reg. 5/2025
- Issuing authority for PMA
- Minister/Head of AgencyMinistry-issued
- Risk + license type
- High·NIB + Operating License (Izin)
- Setup timeline
- PT PMA 4–8 weeks; Emerhub files the Operating License (typically 2–6 months ministry review).
What's specific to this sector
- 01
IUP/IUPK concessions allocated through ESDM auctions; foreign equity capped per the latest mining regulations.
- 02
Domestic Market Obligation (DMO): coal companies must reserve a share of production for domestic power plants.
- 03
Royalty (DHPB) and reclamation/post-mining bond required.