Yes — open to PMA up to 100%.
NIB enables preparation; the separate Operating License is filed with the relevant ministry — Emerhub handles both.
- Foreign ownership
- 100% PMA
- Sector regulator
- Ministry of Energy & Mineral Resources (ESDM) / SKK Migas
- Min. paid-up capital
- IDR 2.5B paid-up · BKPM Reg. 5/2025
- Issuing authority
- Issued via OSS — no separate authority on file
- Risk + license type
- High·NIB + Operating License (Izin)
- Setup timeline
- PT PMA 4–8 weeks; Emerhub files the Operating License (typically 2–6 months ministry review).
What's specific to this sector
- 01
Upstream activities require a Production Sharing Contract (PSC) with SKK Migas.
- 02
Downstream (refining, distribution) is licensed under different regimes; Pertamina holds historical strategic position.
- 03
Foreign participation common but PSC terms are negotiated case-by-case.
