License for Oil and Natural Gas Transportation Business

UMKU PB Detail

Parameter

  • All

Authority

  • Minister/Head of Agency

Requirements

  1. Technical Requirements (Land Mode): Feasibility Study;
    Duration: -
  2. Technical Requirements (Sea Mode): Temporary Business License (SK Izin Usaha Sementara) and its Adjustment/Extension;
    Duration: -
  3. Technical Requirements (Sea Mode): Gross Ship Act and/or Lease Agreement if applicable;
    Duration: -
  4. Technical Requirements (Sea Mode): Safety Equipment and Installation Inspection Report;
    Duration: -
  5. Technical Requirements (Sea Mode): Environmental Permit (for SPPBE/SPPEK);
    Duration: -
  6. Administrative Requirements (River Mode): Beneficial Ownership Shareholding Structure;
    Duration: -
  7. Technical Requirements (River Mode): Feasibility Study;
    Duration: -
  8. Technical Requirements (River Mode): Registration Certificate or Registration Letter and its completeness;
    Duration: -
  9. Technical Requirements (Air Mode): Feasibility Study;
    Duration: -
  10. Technical Requirements (Air Mode): Operating Permit;
    Duration: -
  11. Technical Requirements (Air Mode): Statement regarding the ownership of DGHM (Dangerous Good Handling Manual);
    Duration: -
  12. Technical Requirements (Land Mode): Temporary Business License (SK Izin Usaha Sementara) and its Adjustment/Extension;
    Duration: -
  13. Technical Requirements (Rail Mode): Feasibility Study;
    Duration: -
  14. Technical Requirements (Rail Mode): Operating Permit along with its endorsement;
    Duration: -
  15. Technical Requirements (Rail Mode): Stamped declaration indicating the establishment and implementation of the Safety Operations Regulations (PKO);
    Duration: -
  16. Administrative Requirements (Pipeline Mode): Beneficial Ownership Shareholding Structure;
    Duration: -
  17. Technical Requirements (Pipeline Mode): Feasibility Study;
    Duration: -
  18. Technical Requirements (Pipeline Mode): Temporary Business License (SK Izin Usaha Sementara) and its Adjustment/Extension;
    Duration: -
  19. Technical Requirements (Pipeline Mode): Environmental Permit;
    Duration: -
  20. Technical Requirements (Pipeline Mode): Equipment and Installation Safety Inspection Report;
    Duration: -
  21. Technical Requirements (Pipeline Mode): Special Rights from the Downstream Oil and Gas Regulatory Body (for oil commodities);
    Duration: -
  22. Technical Requirements (Land Mode): Vehicle Registration Certificate and/or Lease Agreement if applicable (except SPPBE, minimum SPPB);
    Duration: -
  23. Technical Requirements (Land Mode): Equipment Safety Inspection Report (road and/or rail transportation);
    Duration: -
  24. Technical Requirements (Land Mode): Equipment and Installation Safety Inspection Report (road and/or rail transportation);
    Duration: -
  25. Technical Requirements (Land Mode): Environmental Permit (for SPPBE);
    Duration: -
  26. Technical Requirements (Land Mode): Declaration of Environmental Monitoring and Management Capability;
    Duration: -
  27. Administrative Requirements (Sea Mode): Benef
Sector: Energy and Mineral Resources
Status: Available

Need advice on setting up a company in Indonesia?

KBLI.co.id is a subsidiary of Emerhub, the largest independet corporate advisory firm in Indonesia.

Schedule a free consultation
Share your plans for Indonesia with us, and our advisors will recommend the most appropriate type and classification of legal entity for your needs.
No commitment required
We recognize that you might be in the exploratory phase of deciding whether and how to expand into Indonesia. Allow us to simplify this process for you.
Always credible information
Due to frequent changes in regulations and government policies, there is a prevalence of misleading and outdated advice. As we handle company registrations daily, we are well-informed about the most current information.
Your planned activities in Indonesia