Operational Fitness Approval.
UMKU Details
Parameter: -
Authority: -
Requirements and Obligations:
-
1. Letter of application from the Chief Technical Officer of BU/BUT or the Company's Management of Oil and Gas Supporting Businesses after conducting Safety Inspection and Examination of Installation addressed to: Director of Technical and Environmental Affairs as the Head of Inspection
Duration: -
-
2. Equipment and installation documents;
Minutes of Inspection Results
Report on Inspection Results
Duration: -
-
3. Inspection Results Report or Equipment and Installation Inspection Certificate
Duration: -
-
4. Administrative Completeness;
Safety Inspection Results Report
Follow-up of Safety Inspection Results Report (if available)
Inspection Plan or Inspection and Test Plan (ITP) agreed upon by relevant parties
Business License or Temporary Business License (specifically for downstream Oil and Gas activities)
Design Review Results from the Chief Technical Officer or the Company's Supporting Institution or designated Engineering Institution (for new installations)
List of Installations and/or equipment
Process Flow Diagram (PFD) and Piping and Instrument Diagram (P&ID)
Certificate of Suitability for Installation Use or previous Operation Approval (for existing installations)
Risk Analysis Results (if available)
Lifespan Extension Assessment Results (for equipment that has exceeded the design lifespan)
Location and Capacity Data.
Duration: -
-
5. If the documents submitted are incomplete and incorrect, DMT will issue a rejection letter for the issuance of Operation Eligibility Approval.
Duration: -
Obligations:
-
1. Any changes to installations must be reported to the Head of Gas Inspection, and safety inspections can be carried out on these installations
Duration: -
-
2. Safety inspections shall be carried out no later than 3 months before the expiration of the Approval period; and
Duration: -
-
3. If events occur that render the installation unfit and unsafe to operate and there are incorrect documents, the Approval may be reviewed
Duration: -
-
4. For the purpose of equipment data documentation, the Chief Technical Officer or Inspection Company must submit, among other things:
Minutes of Inspection Results
Report on Inspection Results
Inspection Results Report or Inspection Certificate.
Duration: -
-
5. Business License Holders, Joint Work Contract Contractors, Business Entities for the construction and operation of natural gas pipelines for their own needs, or Supporting Business Entities are fully responsible for the safety of such installations
Duration: -