Permit for the Construction of a Public Port

UMKU (Pre-Feasibility Study) Details

Parameter: All

Authority: Minister/Head of Agency

Requirements: Obligations

  1. Concession agreement documents for port operation or other cooperation forms in accordance with the regulations;

    Timeframe: 2 Years

  2. Port Master Plan documents; and

    Timeframe: 2 Years

  3. Technical plans for the port construction, including at least:
    1. Drawings illustrating the site layout, floor plans, elevations, and sections;
    2. Foundation plan drawings, including details;
    3. Drawings of columns, beams, slabs, and their details;
    4. Soil conditions (borelogs/stratigraphy);
    5. Placement plans for navigational aids;
    6. Geographic coordinates, at least 4 (four) points, including 2 (two) points on the dock/water side and 2 (two) points on the land side.

    Timeframe: 2 Years

Sector: communication
Status: Available

Need advice on setting up a company in Indonesia?

KBLI.co.id is a subsidiary of Emerhub, the largest independet corporate advisory firm in Indonesia.

Schedule a free consultation
Share your plans for Indonesia with us, and our advisors will recommend the most appropriate type and classification of legal entity for your needs.
No commitment required
We recognize that you might be in the exploratory phase of deciding whether and how to expand into Indonesia. Allow us to simplify this process for you.
Always credible information
Due to frequent changes in regulations and government policies, there is a prevalence of misleading and outdated advice. As we handle company registrations daily, we are well-informed about the most current information.
Your planned activities in Indonesia