Extension of Groundwater Utilization Permit.

  • Parameter: Cross-border river areas, national strategic river areas, and cross-provincial river areas. Authority: Minister/Head of the Agency Requirements:
    1. Land ownership data
      Duration: 14 Days
    2. Copies of expiring groundwater utilization permits
      Duration: 14 Days
    3. Monthly summary of groundwater extraction for the past 1 (one) year
      Duration: 14 Days
    4. Photos of boreholes and other groundwater use facilities with Geotagging (compilation in one A4 sheet)
      Duration: 14 Days
    5. Certificate from the PDAM (Public Water Supply Company) regarding the availability or unavailability of water through the PDAM network
      Duration: 14 Days
    6. Biannual water quality analysis reports for the past 1 year (for medium and large-scale enterprises)
      Duration: 14 Days
    7. Monthly measurements of groundwater levels (mbmt) (for medium and large-scale enterprises)
      Duration: 14 Days
    8. Copies of borehole log, borehole construction, and/or borehole camera recording photos (for medium and large-scale enterprises)
      Duration: 14 Days
    9. Copies of data and analysis of pumping tests (for medium and large-scale enterprises)
      Duration: 14 Days
    10. Certificate of having built infiltration/recharge wells
      Duration: 14 Days
    11. Administrative data for applications for New Groundwater Utilization Permits:
      - Business Entity Name
      - Business Entity Address
      - Business Entity Contact Number
      - Business Entity Email Address (E-Mail)
      - Borehole/Excavation Site Address
      - Coordinate points of borehole/excavation location
      - Groundwater Utilization Period
      - Borehole/Excavation Number
      - Planned groundwater extraction volume (m3/day)
      - Planned groundwater use purpose
      - Approval extension number
      - Standard field classification code
      Duration: 14 Days
  • Obligations:
    1. Pay groundwater tax and other financial obligations as per legal regulations
      Duration: -
    2. Install a water meter on the borehole outlet pipe
      Duration: -
    3. Construct infiltration/recharge wells following guidelines issued by PATGTL (Groundwater Control and Monitoring Center)
      Duration: -
    4. Protect and preserve the continuity of groundwater function
      Duration: -
    5. Recover environmental damage caused by groundwater utilization activities
      Duration: -
    6. Not interfere with the daily basic needs of the surrounding community
      Duration: -
    7. Provide compensation to the surrounding community if groundwater utilization activities cause harm to the community
      Duration: -
    8. Provide a positive response in case of social disturbances in the surrounding community related to groundwater utilization activities
      Duration: -
    9. Report to the Head of PATGTL if anything that could endanger the environment is found during groundwater extraction
      Duration: -
    10. Comply with the provisions in the Groundwater Utilization Permit
      Duration: -
    11. Submit monthly reports on groundwater level measurements, biannual water quality analysis results, and monthly groundwater extraction rates to PATGTL (for medium and large-scale enterprises)
      Duration: -
    12. Construct groundwater monitoring wells equipped with Automatic Water Level Recorders (AWLR):
      - One monitoring well for every 5 (five) borehole/excavation applications and multiples at one location;
      - One monitoring well for each groundwater extraction equal to or greater than 50 (fifty) liters/second from multiple production boreholes at one location;
      - One monitoring well for each production borehole with a flow rate equal to or greater than 50 (fifty) liters/second
      Duration: -
    13. Provide a minimum of 10% of the granted groundwater extraction volume in the Groundwater Utilization Permit to assist in fulfilling the water needs of the surrounding community within the groundwater utilization area or by providing boreholes/excavations for communities facing difficulties in accessing clean water (for medium and large-scale enterprises)
      Duration: -
    14. Fulfill other obligations as per legal regulations
      Duration: -
Sector: Energy and Mineral Resources.
Status: Available
Belongs to: All KBLI

Need advice on setting up a company in Indonesia?

KBLI.co.id is a subsidiary of Emerhub, the largest independet corporate advisory firm in Indonesia.

Schedule a free consultation
Share your plans for Indonesia with us, and our advisors will recommend the most appropriate type and classification of legal entity for your needs.
No commitment required
We recognize that you might be in the exploratory phase of deciding whether and how to expand into Indonesia. Allow us to simplify this process for you.
Always credible information
Due to frequent changes in regulations and government policies, there is a prevalence of misleading and outdated advice. As we handle company registrations daily, we are well-informed about the most current information.
Your planned activities in Indonesia