Open to PMA, with sub-activity carve-outs.
NIB enables preparation; the separate Operating License is filed with the relevant ministry — Emerhub handles both.
- Foreign ownership
- 100% PMA
- Sector regulator
- No sector-specific regulator on file
- Min. paid-up capital
- IDR 2.5B paid-up · BKPM Reg. 5/2025
- Issuing authority for PMA
- Minister/Head of AgencyMinistry-issued
- Risk + license type
- High·NIB + Operating License (Izin)
- Setup timeline
- PT PMA 4–8 weeks; Emerhub files the Operating License (typically 2–6 months ministry review).
