43294Instalasi Nuklir
Nuclear Installation
Last updated · Sourced from OSS Indonesia
This group includes activities related to the installation of nuclear reactors and non-reactor nuclear installations.
Key facts for KBLI 43294
The essentials a foreign investor needs to know before reading the rest of this page.
100% foreign ownership permitted via PT PMA. KBLI 43294 is not on Indonesia's closed, conditional, SME-reserved or partnership-required schedules under Pres. Reg. 10/2021.
Default minimum paid-up capital: IDR 2.5 billion (~USD 160K) under BKPM Reg. 5/2025 (effective Oct 2025) — applies unless a sector regulator sets a higher figure for this activity. The often-cited IDR 10 billion is the total investment commitment per KBLI realised over time via quarterly LKPM reports, not required upfront.
High-risk activity — requires NIB + full Operating License (Izin) to operate commercially. NIB alone enables only the preparation stage; an Operating License must be obtained before invoicing or production starts.
Statutory licensing turnaround: 6 days once we submit the application — on top of the 2–3 weeks for PT PMA incorporation. We coordinate the full sequence end-to-end.
Issuing authority for PMA: Menteri/Kepala Badan — specific to foreign-owned entities under this KBLI.
SBU classification required: Sertifikat Badan Usaha from LPJK is mandatory for construction activities, in addition to project-specific PBG (Building Approval).
Ongoing reporting: quarterly LKPM (Investment Activity Report) to BKPM plus 8 sector-specific obligations. We file these on your behalf as part of monthly compliance — you stay out of the OSS portal entirely.
- Risk level
- HighNIB + full Operating License
- Primary license
- NIB + full Operating License (Izin)NIB enables preparation only — additional permit needed to operate
- Setup timeline
- 6 DaysStatutory turnaround at OSS
- Issuing authority
- Minister / Agency HeadFor foreign-owned (PMA) entities
- Min. paid-up capital
- IDR 2.5 BBKPM default paid-up — sector rules may set a higher figure
Foreign investment rules
Indonesia's BUPM (Investment Business Fields) regulation places this code into one of five tracks. The track determines whether a foreign investor (PMA) can operate in this activity at all, and under what conditions.
Fully open to foreign investment
KBLI 43294 is not on Indonesia's closed, conditional, SME-reserved or partnership-required schedules. A foreign investor may incorporate a PT PMA with up to 100% foreign ownership and operate in this activity directly.
How we handle your KBLI 43294 setup
Emerhub is a corporate-services provider in Indonesia. We do the legal and regulatory legwork for foreign investors so you can focus on the business itself. Here's what the engagement looks like.
- 1
Confirm the optimal structure for your business
2–3 business daysWe confirm KBLI 43294 is the right primary code for your business, advise on secondary codes you may also need, and finalize the holding structure with you before any filing.
What we need from you- Founders' passport copies and proof of residence
- Intended share split and board composition
- 2
Incorporate your PT PMA
7–10 business daysWe draft the Articles of Association before a notary, register the entity with the Ministry of Law & Human Rights (Kemenkumham), and obtain the company's tax ID (NPWP). Under BKPM Reg. 5/2025, paid-up capital is IDR 2.5 billion (~USD 160K) — the cash actually deposited at incorporation. The IDR 10 billion+ figure many sources still cite is the total investment commitment per KBLI, realised over time via your LKPM reports.
What we need from you- Powers of attorney (we prepare; you sign and notarize)
- Director / commissioner appointment letters
- Initial capital deposit confirmation
- 3
We obtain your NIB
1–2 business daysWe file the OSS application with KBLI 43294 as your primary business activity, complete the risk-based assessment, and collect the NIB (Business Identification Number) for you — typically within hours of submission. You don't need to touch the OSS portal.
What we need from you- Office address (virtual office acceptable for many KBLIs; we can arrange one)
- 4
Secure your full Operating License (Izin)
6+ business daysNIB is issued for the preparation stage. Commercial operation requires a full Operating License (Izin) issued by the competent ministry after a substantive review of the operator's capability, facility, and compliance. Operating with NIB alone exposes the entity to penalties, blacklisting, and contract invalidation. We prepare the application bundle, liaise with the competent ministry, and chase issuance through to the certificate. Statutory turnaround: 6 business days — real-world timing typically runs longer when site inspections or additional clarifications are requested.
What we need from you- Technical documentation specific to your operation
- Appointment of a Penanggung Jawab Teknis (PJT — technical responsible person)
- LPJK SBU certification — separate from OSS Standard Certificate
- 5
Hand-off to ongoing compliance
OngoingPost-launch we run your monthly tax filings, quarterly LKPM (Investment Activity Reports), annual general meeting (RUPS), and any sector-specific reporting. You get a single point of contact and a monthly compliance digest — no Indonesian-language paperwork on your desk.
What is KBLI 43294?
A plain-English explanation of this classification and the businesses it covers.
KBLI 43294 (Nuclear Installation) is the 5-digit Indonesian Standard Industrial Classification code for instalasi nuklir . It sits within Construction under the subgroup Other Construction Installation ( major group 43 ) in the official KBLI 2020 taxonomy maintained by Statistics Indonesia (BPS).
Who needs KBLI 43294?
Any Indonesian or foreign-owned entity that intends to operate in instalasi nuklir as a primary or secondary business activity must select this code on its NIB (Business Identification Number). The selected code determines the licensing instruments required, the issuing authority, and the ongoing compliance obligations.
Why does the code matter?
Indonesia's OSS Risk-Based Approach uses the KBLI code to determine three things: (1) whether foreign investment is permitted and at what cap, (2) the risk-based licensing instruments required, and (3) the authority that issues each instrument. Choosing the wrong code can delay or invalidate your license.
Construction-specific guidance
Sector context that applies to KBLI 43294 beyond the generic OSS process. Verify with the relevant ministry before committing capital.
- ·Sertifikat Badan Usaha (SBU) classification required from LPJK.
- ·PBG (Building Approval) issued per project by local government.
Under the upcoming KBLI 2025
Indonesia's BPS published the new KBLI 2025 taxonomy in early 2025. OSS, BKPM and the operating ministries have not yet adopted it — KBLI 2020 remains the active standard for business registration. This is what's coming for this specific code.
Reorganised in KBLI 2025
KBLI 43294 does not carry the same number forward into KBLI 2025 — the activity has been reclassified, but the precise mapping isn't recorded in our database yet.
- ·For current operations, KBLI 43294 remains valid — OSS still uses KBLI 2020 for all business registrations.
- ·The KBLI 2025 successor codes are listed in the official BPS transition document below; check for the activity-specific mapping when planning future structures.
- ·Once OSS announces the KBLI 2025 cutover, existing entities will need to update their primary KBLI to the relevant successor — typically straightforward.
When OSS adopts KBLI 2025, we'll migrate your existing entity to the appropriate successor code as part of ongoing compliance — no action needed on your end now.
Talk to a specialistRisk level by business scale
Indonesia's OSS Risk-Based Approach assigns a separate risk level for each of the four business scales. The licensing instruments required (NIB, Standard Certificate, Operating License) are determined by the risk level. Foreign-owned entities (PT PMA) must register at the Large scale, so the rightmost column applies to most foreign investors.
Micro
Small
Medium
Large
PMA scaleWhat does each risk level require to operate? ›
Licensing requirements in detail
Specific permits, application requirements and ongoing obligations vary by business scale and the sub-activity within this KBLI. We file these on your behalf — this section is for transparency on what we'll be handling. Switch between scales below; by default we show Large (the PMA scale).
Konstruksi Reaktor Daya Mikro D ≤ 30 MWt (D ≤ 10 MWe)
Application requirements
14Documents and capabilities you must demonstrate at registration
- 01Program konstruksi
- 02Persetujuan desain
- 03Desain rinci reaktor nuklir
- 04Laporan analisis keselamatan
- 05Documents of limitations and operational conditions
- 06Radiation protection and safety program
- 07Program manajemen penuaan
- 08Dokumen rencana proteksi fisik
- 09Dokumen sistem garda aman
- 10Dokumen sistem manajemen
- 11Program kesiapsiagaan nuklir
- 12Daftar informasi desain
- 13Program dekomisioning
- 14Jaminan finansial pelaksanaan konstruksi
Ongoing obligations
9Compliance and reporting duties throughout operation
- 01Conduct construction activities up to the testing of structures, systems, and components both without nuclear fuel and with nuclear fuel in accordance with safety, security, and safeguard requirements as well as licensing documents.
- 02Dalam hal akan melakukan perubahan desain, pemegang PB wajib mengajukan permohonan persetujuan perubahan desain
- 03Before commissioning, the holder of the PB must obtain commissioning approval in accordance with the standards for micro power reactor commissioning activities, the permit for the utilization of nuclear materials, and the work permit for nuclear installation and nuclear material personnel.
- 04Submit periodic reports on the implementation of construction programs.
- 05Submit periodic reports on the implementation of requirements and obligations related to Environmental Approval.
- 06Conduct site monitoring.
- 07Menyerahkan bukti jaminan finansial dekomisioning secara berkala sejak persetujuan komisioning diterbitkan hingga dekomisioning
- 08Menyerahkan bukti jaminan finansial pertanggungjawaban kerugian nuklir secara berkala sejak persetujuan komisioning diterbitkan hingga dekomisioning
- 09Dalam hal PB Konstruksi Reaktor Daya Mikro telah berakhir, pemegang PB wajib bertanggung jawab atas pengelolaan reaktor nuklir, bahan nuklir, limbah radioaktif, dan pelaksanaan dekomisioning
Issuing authority
The authority that issues the license depends on your situation. Foreign investors typically fall under Minister/Head of Agency · PMA.
| Authority | Applies when |
|---|---|
| Menteri/Kepala Badan | Seluruh |
| Menteri/Kepala Badan | PMA |
