Yes — open to PMA up to 100%.
Operating license routes through Ministry of Agriculture, not OSS — Emerhub handles the application end-to-end.
- Foreign ownership
- 100% PMA
- Sector regulator
- Ministry of Agriculture (Kementan)
- Min. paid-up capital
- IDR 2.5B paid-up · BKPM Reg. 5/2025
- Issuing authority for PMA
- Minister/Head of AgencyMinistry-issuedDomestic registrants route through Regent/Mayor instead.
- Risk + license type
- Medium-High·NIB + Verified Standard Cert.
- Setup timeline
- PT PMA 4–8 weeks; Emerhub files the verified Standard Certificate (1–2 months ministry review).
What's specific to this sector
- 01
Operations on land >25 Ha typically require an HGU (Right to Cultivate) land title — secure this before operating.
- 02
Good Agricultural Practices (GAP) compliance is mandatory and audited.
- 03
Many farming activities under 25 Ha are reserved for cooperatives and Indonesian SMEs (UMKM); foreign investors should choose larger-scale operations or processing-stage codes.
